Challenge
In parallel with managing a greenfield project, an existing production site had to be closed and the entire manufacturing operation relocated to a new plant.
Planned duration: 8 weeks – without production downtime and without jeopardizing delivery capability.
Intervention
Result:
Impact: The relocation became a controlled transition—not an operational risk event.